A.making inward operation B.making outward operation C.making cargo operation D.at anchor
A.call the Master immediately B.stop the engines C.sound the “Man Overboard” signal of 3 prolonged blasts on the whistle and 3 prolonged blasts on the general alarm D.prepare,as many as possible,rescue facilities,including warm clothes
A.The testing of the internal combustion engine driven emergency generators at least once each month the vessel is navigated B.The testing of storage batteries for emergency lighting and power systems once each 6 months the vessel is navigated C.The actual draft when the vessel arrives in salt water after departing a port D.The testing of the line-throwing appliance once every 3 months