A.to B.of C.for D.about
A.The required oily-water separator malfunctions B.The ship is transferred to Liberian registry C.An annual survey is conducted fifteen months after the date of certificate issuance D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material B.name of the alternative standard or specification C.the ASTM or ABS specification the material approximates D.manufacturer or origin of the material